The PDWP approves seven development schemes worth Rs 9 Billion

 
The 11th meeting of Provincial Development Working Party (PDWP) F.Y 2024-25 was held under the Chairmanship of Chairman P&D Board Barrister Nabeel Ahmad Awan in which seven development schemes of Roads, and P&S HC sectors are approved with an estimated cost of Rs 8974.993 million
The approved schemes are as follows:
1) Rehabilitation of Shujabad Jalalpur Pirwala Length = 48.50 Km, District Multan at the cost of Rs 2700.697 million
2) Dualization of Metalled Road from Thalli Chowk Rahim Yar Khan to Iqbalabad (N-5) District R.Y.Khan at the cost of Rs 1025.247 million
3) Rehabilitation of road from Kasur to Raiwind, Length 25.48 Km in district kasur at the cost of Rs 2095.294 million
4) Rehabilitation of metalled road from Shoria Gilania Chowk (N-55) to Samina Sadat Length = 8.80 Km at the cost of Rs 418.345 million
5) Construction of Fly over at Jhal road railway crossing to Sahiwal City at Rs 914 million
6) Construction of Dual Carriageway Road from M-3 Motorway Samundri Interchange to Samundri City (L=9.50), District Faisalabad at the cost of Rs 1767.119 million
7) Infection Control Program Phase (II) at the cost of Rs 473.636 million
Secretary P&D Board Dr Asif Tufail, Chief Economist Dr Nasir Iqbal Malik, Members P&D Board, Head of relevant deptts and other senior representatives of the relevant provincial departments attended the meeting.