EDUCATION SECTOR
Establishment of Cadet College Khanpur, R.Y. Khan.
Cost: PKR 544.757 million | Status: Approved
Acquisition of Land for Establishment of University of Gujrat Sub Campus, Narowal.
Cost: PKR 253.993 million | Status: Approved
AGRICULTURE SECTOR
Provision of Forensic Pesticide Testing Facilities at Provincial Pesticide Reference Laboratory, Kala Shah Kaku.
Cost: PKR 337.100 million | Status: Deferred
Provision of Forensic Fertilizer Testing Facilities at Provincial Reference Fertilizer Testing Laboratory, Raiwind, Lahore.
Cost: PKR 253.255 million | Status: Deferred
HEALTH SECTOR
Renovation of Nishtar Medical College, Multan. (Revised)
Cost: PKR 311.433 million | Status: Approved
Establishment of Children Hospital at Bahawalpur.
Cost: PKR 4899.127 million | Status: withdrawn
Establishment of Directorate General of Monitoring and Evaluation (Health)
Cost: PKR 333.586 million | Status: Approved
PUBLIC BUILDINGS SECTOR
Topographic Survey and Geotechnical Studies for Land Sliding Zonation of Murree Hills Area Mainly Located Between old Rawalpindi–Murree Road and Islamabad – Murree Expressway in Murree, Rawalpindi. (Revised PC-II)
Cost: PKR 197.246 million | Status: Approved
ROADS SECTOR
Umberella PC-I Rehabilitation / Widening of 10’-12’ Rural Roads under Khadam-e-Punjab Rural Roads Programme (KPRRP), Phase-II (Part-A) in Punjab Highways Department, South Zone.
Cost: PKR 5875.051 million | Status: Approved
Construction of Bridge Over River Indus Near Miranpur on Linking N-55 at Arbi Tibba with Rahim Yar Khan Length=4000 RFT, District R.Y. Khan (3rd Revised)
Cost: PKR 3951.392 million | Status: Approved