Education Sector
|
| Provision of Laptops. (Revised) . |
| Cost: PKR 4,946.326 million | Status: Approved |
| |
| Provision of Laptops. (2014-15). |
| Cost: PKR 5,486.786 million | Status: Deferred | ADP No. 381 (New) |
| |
PPH Sector
|
| Urban Water Supply Scheme Shahkot District Nankana Sahib (Revised). |
| Cost: PKR 214.373 million | Status: Approved | ADP No. 785 (On-Going) |
| |
Forestry Sector
|
| Establishment of Wildlife Park at Jauharabad, District Khushab. |
| Cost: PKR 268.586 million | Status: Approved | ADP No. 2332 (New) |
| |
| Development of Animal Safaris and Improvement of Existing Facilities at Safari Zoo, Lahore. |
| Cost: PKR 460.704 million | Status: Approved | ADP No. 2333 (New) |
Public Building Sector
|
| Construction of District Jail, Bhakkar. |
| Cost: PKR 415.945 million | Status: Deferred |
| |
Roads Sector
|
| Construction of Road from Badiana-Bhogiwal-Merajke-Charwa Road (length=26.77 km) District Sialkot. |
| Cost: PKR 339.793 million | Status: Approved | ADP No. 1270 (On-going) |
| |
| Construction of Faisalabad Ring Road (Missing Links Between Faisalabad Sargodha Road and Faisalabad Chak Jhumra Road), length=11.82 km, Faisalabad. (Revised) . |
| Cost: PKR 360.297 million | Status: Approved | ADP No. 1245 (On-going) |
| |
| Construction / Improvement of road from Chak No. 71/SB to Sargodha Lahore Road along Chokera Minor I/C link 74/SB length 30.49 km, Sargodha (Revised) . |
| Cost: PKR 339.537 million | Status: Approved | ADP No. 1230 (On-going) |
| |
Irrigation Sector
|
| Protection of Bhakkar Flood Bund from Erosive Action Between RD 0+000 to 76+000 to save Abadies Agriculture Land and other Infrastructures of Bhakkar City. |
| Cost: PKR 892.218 million | Status: Approved | ADP No. 1758 (New) |
| |
| Feasibility Study for Rehabilitation of Haveli Main Line. (PC-II). |
| Cost: PKR 28.872 million | Status: Approved | ADP No. 1720 (New) |
| |
| Feasibility Study for Rehabilitation of D.G. Khan Canal System. (PC-II). |
| Cost: PKR 23.538 million | Status: Approved | ADP No. 1718 (New) |
| |
| Rehabilitation / Concrete Lining of Sharqpur Disty System (Sharqpur Disty, Jodkhke Minor, Tashpur Sub Minor & Mundi Sub Minor), District Nankana Sahib. |
| Cost: PKR 853.390 million | Status: Deferred | ADP No. 1739 (New) |
| |