24th PDWP

PPP SECTOR                                                                          

Construction of Surface Water Treatment Plant at Jhang Branch Canal, Faisalabad (PPP Mode) (PC-II).

Cost: PKR 18.000 million| Status: Approved                      

ROADS SECTOR                                                                    

Construction of Bridge over River Chenab at Shahbazpur to Connect District Gujrat with District Sialkot in District Gujrat.

Cost: PKR 3926.760 million| Status: Approved                              

Re-habilitation of Sadhoke to Baigpur L=23.00 km Road, District Gujranwala.

Cost: PKR 421.646 million| Status: Approved

Dualization of Sialkot-Eminabad Road upto Dharam Kot km # 0/0 to 37/20 (length=37.20 km), District Sialkot.

Cost: PKR 3168.034 million| Status: Deferred                                

Rehabilitation / Widening of road from Buchal Kalan to Lillah, length 25.00 km (Phase-I L=13 km) District Chakwal.

Cost: PKR 503.664 million| Status: Approved