ROADS SECTOR
Construction of Bridge over River Indus Near Miran Pur on linking N-55 at Arbi Tibba with R.Y. Khan (length:4000 Rft), R.Y. Khan.
Cost: PKR 3951.392 million| Status: Deferred
Dualization of Khanewal Lodhran Road length=93.00 km in District Khanewal, Vehari and Lodhran, Section: from km 00.00 to 39.00 length=39 km, District Khanewal.
Cost: PKR 8575.250 million| Status: Deferred
Dualization of Khanewal Lodhran Road Section from km 0.00 to 93.00 length=93.00 km in District Khanewal Vehari and Lodhran (Section: from km No. 39.00 to 50.00 = 11.00 km), Vehari.
Cost: PKR 2227.415 million| Status: Deferred
Dualization of Khanewal Lodhran Road length=93.00 km in District Khanewal/ Vehari and Lodhran, Section: from km 50.00 to 93.00 length=43 km, District Vehari and Lodhran.
Cost: PKR 7349.209 million| Status: Deferred
Dualization of Khanewal Lodhran Road Section: Construction of Flyovers on Khanewal Lodhran Road, District Khanewal and Vehari.
Cost: PKR 2502.539 million| Status: Deferred
PPP SECTOR
Construction of Building for Institute of Tourism and Hotel Management (ITHM) (PPP Mode) (PC-II)
Cost: PKR 9.945 million| Status: Deferred
PPH SECTOR
Multi Sectoral Nutrition Strategy for WASH including Water Supply, Sanitation, Hygiene, Wastewater Treatment Disposal of Solid Waste (10 Villages of Brackish / Barani Districts with Minimum Population of 5000 Persons one from Each Civil Division)
Cost: PKR 899.452 million| Status: Deferred
URBAN DEV. SECTOR
Area Development Scheme No.II Sheikhupura (Revised).
Cost: PKR 701.828 million| Status: Approved
DP SECTOR
Conservation of Wazir Khan Mosque, Lahore.
Cost: PKR 533.057 million| Status: Not discussed
P&D SECTOR
Framework for Resident, TPV and Owners Consultant
Issue Not discussed