P&D SECTOR
ADP Formulation Strategy Paper 2017-18: Framework for Optimizing Investment Decisions.
Issue
Functional and Institutional Review of the P&DD.
Issue
Punjab Health Survey Round II, 2017 (PC-II)
Cost: PKR 35.00 million| Status: Approved
ROADS SECTOR
Construction of High Level Bridge over River Jhelum at Langarwala Pattan to Sahiwal in Sargodh & Khushab District. (Revised)
Cost: PKR 3037.000 million| Status: Approved
Dualization of Khanewal Lodhran Road (Section from km 00.00 to 40.00 length=40 km) District Khanewal.
Cost: PKR 7933.221 million| Status: Approved
Dualization of Khanewal Lodhran Road (Section from Km 40.00 to 51.00=11.00 km, District Vehari.
Cost: PKR 2535.128 million| Status: Approved
Dualization of Khanewal Lodhran Road (Section from km 51.00 to 94.00=43 km, District Lodhran.
Cost: PKR 7688.145 million| Status: Approved
Construction of Flyover on Khanewal Lodhran Road, at Chowk Matila District Vehari.
Cost: PKR 1148.217 million| Status: Approved
Construction of Interchange on Khanewal Lodhran Road, District Khanewal.
Cost: PKR 2458.416 million| Status: Approved