HEALTH SECTOR
Construction of 100 Bedded Mian Muhammad Shahbaz Sharif General Hospital, Multan. (Phase-I)
Cost: PKR 410.886 million | Status: Not Discussed
PPH SECTOR
Feasibility Study and Design for Sewerage / Drainage Scheme Zahir Pir, R.Y. Khan. (PC-II)
Cost: PKR 15.877 million | Status: Approved
UD SECTOR
Replacement of 45-No. Tubewells of WASA, Lahore.
Cost: PKR 649.72million | Status: Deferred
IRRIGATION SECTOR
Establishment of Strategic Planning / Reform Unit (SPRU) in Irrigation Department (Revised)
Cost: PKR 358.605 million | Status: Approved