π“π‘πž 𝐏𝐃𝐖𝐏 π€π©π©π«π¨π―πžπ¬ πŸŽπŸ• πƒπžπ―πžπ₯𝐨𝐩𝐦𝐞𝐧𝐭 π’πœπ‘πžπ¦πžπ¬ 𝐖𝐨𝐫𝐭𝐑 𝐑𝐬. πŸ“.𝟏 𝐁𝐒π₯π₯𝐒𝐨𝐧

The 22nd Meeting of PDWP FY 2025–26, chaired by Dr. Naeem Rauf (Chairman P&D Board, Punjab) βœ… Approvals: πŸ›£οΈ Road (Widening/Construction of Danda Shah Bilawal–Ghool via Lawa, Chakwal) – at the estimated cost of Rs. 1374.886 m CM Minority Development Program – at the estimated cost of Rs. 1000 m πŸŒ‰ Sky Walk Glass Bridge (Murree, Feasibility) – at the estimated cost of Rs. 72.152 m 🚑 Cable Car at River Indus in Kala Bagh (Mianwali, Feasibility) – at the estimated cost of Rs. 81m 🚠 Chairlift & Cable Car (Lakot–Pindi Point, Murree, Feasibility) – at the estimated cost of Rs. 90m 🎑 Theme Park (Lahore, Feasibility Study) – at the estimated cost of Rs. 200 m πŸ’» Accelerate Punjab (Startups Tech) – at the estimated cost of Rs. 2300m πŸ‘‰ Total Cost: Rs. 5.118 Billion πŸ‘‰ Sectors: Roads | HR&MA | Tourism | IT