Education Sector
|
| Acquisition of 1604-K&10-M Land for Establishment of Narowal Campus of University of Engineering & Technology, Lahore, District Narowal |
| Cost: PKR 296.182 million | Status: Approved |
| |
| Provision of Laptops |
| Cost: PKR 1000.00 million | Status: Approved | ADP No. Ex-agenda |
| |
Health Sector
|
| Establishment of 60 Bedded THQ Hospital at Raiwind Lahore |
| Cost: PKR 345.008 million | Status: Approved |
| |
| Establishment of I.C.U. at B.V. Hospital Bahawalpur. (Revised) |
| Cost: PKR 275.522 million | Status: Approved | ADP No. 422 (on-going) |
| |
Irrigation Sector
|
| Enhancing the Capacity of Charrar Drain to Cater for Rain Water of Ring Road (Package-A&B), Lahore. (Revised) |
| Cost: PKR 542.504 million | Status: Deferred | ADP No. 930 (on-going) |
| |
| Establishment of Strategic Planning / Reform Unit in Irrigation Department. (PC-II) |
| Cost: PKR 138.345 million | Status: Approved | ADP No. 913 (on-going) |
| |
PPH Sector
|
| Comprehensive Water Supply & Sewerage Scheme Mianwali |
| Cost: PKR 431.646 million | Status: Approved | ADP No. 489 (on-going) |
| |
| Comprehensive Urban Water Supply & Sewerage Scheme District Headquarter Jauharabad District Khushab |
| Cost: PKR 479.335 million | Status: Approved | ADP No. 488 (on-going) |
| |
| Comprehensive Urban Water Supply & Sewerage Scheme Khushab |
| Cost: PKR 314.591 million | Status: Approved | ADP No. 487 (on-going) |
| |
Roads Sector
|
| Construction of Additional Bridge over River Ravi (4-Lane), Lahore |
| Cost: PKR 882.615 million | Status: Deferred | ADP No. 898 (New) |
| |
| Widening / Improvement of THAT pail road km 165.75 to 193.20 i/c Talagang Byepass L=3.80 km total length=32.21 km District Chakwal |
| Cost: PKR 858.826 million | Status: Approved |
| |
| Dualization of Khushab Muzaffargarh Road from Railway Crossing to Khanpur Bagga Sher (Balance Length) from km No: 287.55 to 292.00 length=4.45 km |
| Cost: PKR 218.101 million | Status: Approved | ADP No. 906 (New) |
| |